top of page

Wetlands and Waters Permitting 101

15 hours ago
4 min read
Aerial view of a road through wetlands with neon boundary lines; text reads Wetlands and Waters Permitting 101, White Buffalo logo


Wetlands, Waters, and Delineation

Work in or near streams, rivers, lakes, or wetlands may need a permit from the U.S. Army Corps of Engineers (USACE) under Section 404 of the Clean Water Act, Section 10 of the Rivers and Harbors Act, or both. Knowing early which waters are on your site, and whether they are federally regulated, is one of the best ways to avoid permit delays and redesigns. Most projects start with a wetland delineation.


Section 404 vs. Section 10


Section 404 (Clean Water Act)

Section 10 (Rivers and Harbors Act of 1899)

What it regulates

Discharge of dredged or fill material

Any structure or work in, over, or under the water, or that affects its course or capacity

Which waters

Waters of the United States (WOTUS), including some wetlands and tributaries

Navigable waters of the United States: tidal waters and waters used, or usable, for interstate commerce

Typical activities

Trenching, backfill, temporary fill for access or crossings, grading, and riprap in streams or wetlands

Boring or cables under a navigable river, aerial crossings, docks, bridges, piers, and dredging

Permitting agency

USACE, with EPA oversight

USACE


The two often overlap. A cable crossing of a navigable river can need both, and a single Corps permit can authorize both.


Which Waters are Regulated

The reach of Section 404 depends on the definition of "waters of the United States" (WOTUS), which has changed often. In 2023, the Supreme Court's Sackett v. EPA decision narrowed federal jurisdiction over wetlands to those with a continuous surface connection to a regulated water.


The definition is being rewritten again:

  • November 2025: EPA and the Army proposed a new definition that used a "wet season" test for relatively permanent waters and adjacent wetlands (Bracewell).

  • September 2026: A supplemental proposal would replace the wet-season test with a stricter perennial-flow standard. It would also limit jurisdiction to the part of a wetland that is indistinguishable from the connected water (Bracewell).


As of this guide's date, no final rule has been issued, and litigation is expected once one is. Waters outside federal jurisdiction may still be regulated by your state, so check state and local requirements too.


Permit Types

Permit

When it fits

What to expect

Nationwide Permit (NWP)

Activities with minimal impacts that match one of the Corps' national permits

Fastest route; some activities need a pre-construction notification (PCN) to the Corps before work starts

Regional General Permit

Activity types a Corps district or state has pre-approved for its area

Similar to an NWP, with local conditions

Individual Permit

Larger impacts, or activities no general permit covers

Public notice, alternatives analysis, and a longer review


The current NWPs took effect March 15, 2026, and expire March 15, 2031. They authorize work under both Section 404 and Section 10 (Federal Register). Broadband and telecom work usually falls under NWP 57, Electric Utility Line and Telecommunications Activities. For linear projects, crossings of separate and distant waters can each qualify on their own. Corps districts add regional conditions, so always check your district's version.


What a Wetland Delineation Is

A delineation is a field study that finds and maps the boundaries of wetlands and other waters on a site. It follows the Corps' 1987 Wetland Delineation Manual and the regional supplement for your part of the country. An area is a wetland when it has all three of these:

  1. Hydric soils: soils formed under saturated conditions, often gray or mottled.

  2. Hydrophytic vegetation: plants adapted to wet conditions.

  3. Wetland hydrology: signs of regular flooding or saturation, such as standing water, a high water table, or water marks.


Scientists also map the ordinary high water mark of streams, rivers, and ponds. The result is a report with data forms, photos, and GPS-mapped boundaries.


A delineation shows where water features are. Whether they are federally regulated is a separate question answered by the Corps through a jurisdictional determination (JD). A preliminary JD treats the features as jurisdictional so a permit can move forward. An approved JD is the Corps' official decision on which features are regulated.


Tips for Fiber and Other Linear Projects

  • Screen early. Check National Wetlands Inventory and soil survey maps during route planning, then field-verify the crossings.

  • Avoid first. Shifting a route or using existing road shoulders can remove a crossing entirely.

  • Bore instead of trench. Directional boring under a stream or wetland often avoids a regulated discharge; plan pits well outside the resource and have a response plan for drilling-fluid releases.

  • Count every crossing. List each stream and wetland crossing with its method and temporary impacts so the Corps can review them together.

  • Allow for seasons. Some indicators are hard to see in winter or drought, so time fieldwork carefully.


How WBE helps

WBE performs desktop screening and field wetland delineations, prepares delineation reports and permit applications, and coordinates with Corps districts and state agencies on NWP, regional, and individual permits. Clients can track permit status in NEPATracker™. This primer is general information, not legal advice.


Sources

Comments


markets-background-contour-lines.png

proud member of the: 

LET'S DISCUSS YOUR PROJECT.
memberCeLogo_small (1)_edited.png

7707 E. 111th St, Suite 101, Tulsa, OK 74133, USA

(918) 660-0999

  • facebook
  • googlePlaces
  • twitter
  • linkedin

©2026 by White Buffalo Environmental, Inc..

Your request has been received. Thank you!

bottom of page